The new medical centre required refurbishment of an existing building and complete new fitout. A high level of detail was required to incorporate maximisation of usable space and very specific technical requirements to meet the client brief.
Co-ordination of a team of consultants and close cooperation with the client and builder was a major component of the success of this project.